Screed has been poured on the ground floor of the Old Latin School in Wittenberg, Germany, to form a smooth and level floor. Also on the ground floor, work is progressing in the bookstore area, including the frames for the glass wall on the north wall, and in the public restrooms.

The walls in the stairwell from the second to the first floor have been newly plastered. In the attic, workers have been installing frames for the glass wall between the elevator and the hallway to the offices. Work in the kitchen area of the large apartment also has been progressing.